Note Details

Category: Processing

September 27, 2006 J Warren & TH See removed C2017 and mounted in the Level 3 fixture in the Level 2 orientation. System setup and initial mosaic taken at 9:25 to check alignment. System was slightly out of alignment and was corrected by Warren & See.