C2005,2,121,0,0 |
Track 121 was recovered from a chip that fell off of C2005 during the tile removal process on February 20, 2007. Nakamura-Messenger used the Ishii knife to extract the track from the chip on June 20,
...
|
Processing |
C2005,2,121,0,0 |
Level 3: T.H. See and J. Warren examined the flakes or fragments that came off of exposed surface of C2005. Each of these fragments was surveyed using the Nikon SMZ1500 microscope looking for tracks.
...
|
Processing |
C2005,2,121,0,0 |
Track 121 is believed to be T2 from the above group and associated photos of the tracks in these various fragments.
|
Processing |
C2005,2,121,0,0 |
Terminal particles extracted and pressed in to Au substrate and sent to Bridges for analysis in July 2007.
|
Processing |
C2005,2,121,0,0 |
From a chip C2005,2 which fell during cell removal. 500um long track with 2 TPs. Enpty chip C2005,2 was allocated also to Bridges (CO14695) after removing this track.
|
Processing |
C2005,2,121,0,0 |
Track 121 was recovered from a chip that fell off of C2005 during the tile removal process on February 20, 2007. Nakamura-Messenger used the Ishii knife to extract the track from the chip on June 20,
...
|
Processing |
C2005,2,121,0,0 |
Level 3: T.H. See and J. Warren examined the flakes or fragments that came off of exposed surface of C2005. Each of these fragments was surveyed using the Nikon SMZ1500 microscope looking for tracks.
...
|
Processing |
C2005,2,121,0,0 |
Track 121 is believed to be T2 from the above group and associated photos of the tracks in these various fragments.
|
Processing |
C2005,2,121,0,0 |
Terminal particles extracted and pressed in to Au substrate and sent to Bridges for analysis in July 2007.
|
Processing |
C2005,2,121,0,0 |
From a chip C2005,2 which fell during cell removal. 500um long track with 2 TPs. Enpty chip C2005,2 was allocated also to Bridges (CO14695) after removing this track.
|
Processing |
C2005,2,121,0,0 |
From Brownlee's Files - Keystone cut by Bastien 07/30//2007, Was track TB. Keystone broke when forked. Terminal particle prssibly lost. 275um track length.
|
Inventory |
C2005,2,121,0,0 |
Keystone cut by Bastien 07/30//2007, Was track TB. Keystone broke when forked. Terminal particle prssibly lost. 275um track length.
|
|
C2005,2,121,0,0 |
Length / Depth: ~ 900 µm
|
Analysis |
C2005,2,121,0,0 |
From a chip C2005,2 which fell during cell removal. 500um long track with 2 TPs. Enpty chip C2005,2 was allocated also to Bridges (CO14695) after removing this track.
|
Processing |
C2005,2,121,0,0 |
Track 121 was recovered from a chip that fell off of C2005 during the tile removal process on February 20, 2007. Nakamura-Messenger used the Ishii knife to extract the track from the chip on June 20,
...
|
Processing |
C2005,2,121,0,0 |
Level 3: T.H. See and J. Warren examined the flakes or fragments that came off of exposed surface of C2005. Each of these fragments was surveyed using the Nikon SMZ1500 microscope looking for tracks.
...
|
Processing |
C2005,2,121,0,0 |
Track 121 is believed to be T2 from the above group and associated photos of the tracks in these various fragments.
|
Processing |
C2005,2,121,0,0 |
Terminal particles extracted and pressed in to Au substrate and sent to Bridges for analysis in July 2007.
|
Processing |